Abstract

AbstractNowadays, tunnels with single‐shell segmental lining are often constructed pressure‐tight using gaskets. The economic application limit of this construction type is about 50 metres head of water. If the water pressure exceeds this value, considerably more complex – and thus more expensive – two‐shell construction with an additional drainage layer between the inner and the outer lining is required. To extend the field of application of mechanized tunnelling with single shell lining in mid‐mountain formations, an innovative approach was developed based on the application of a drainage layer in the annular gap fill with a water permeability kF >10–4 m/s. The basic idea of the newly developed water‐permeable material for annular gap grouting is the use of a foam generator without a disturbing body, which foams the cement suspension in a defined way with sufficient compressive strength. Complex interrelations of material, process engineering and construction had to be considered comprehensively. The overall suitability of the developed process has been demonstrated in an extensive experimental program including field tests. The present paper focuses on the development of the construction material.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.