Abstract
A real-time expert system to control wastewater treatment plants is presented. The software has been developed in the G2 environment. It contains: an interface that permits on-line acquisition of plant data using G2 standard interface (GSI), a predictive control algorithm for dissolved oxygen (DO) control, and a graphical interface between the expert system and the operator. The dissolved oxygen control is performed using a non-linear predictive control algorithm, that has been developed to satisfy quality constraints whilst reducing energy demands. The algorithm uses data obtained from the plant by hardware sensors, and software which recursively estimates the oxygen uptake rate. All these elements are integrated in a knowledge base that includes a set of diagnosis, detection, prediction and operation rules, making the system capable of handling a wide number of usual (where predictive control can be useful) and unusual situations (where quantitative and qualitative information must be considered.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.