Abstract
In a multi-wire proportional chamber detector (MWPC), the anode and signal wires must maintain suitable tension, which is very important for the detector’s stable and accurate performance. As a result, wire tension control and measurement is essential in MWPC construction. A high pressure 3He MWPC detector is to be used as the thermal neutron detector of the multi-functional reflectometer at China Spallation Neutron Source, and in the construction of the detector, we have developed a wire tension measurement system. This system is accurate, portable and time-saving. With it, the wire tension on an anode wire plane has been tested. The measurement results show that the wire tension control techniques used in detector manufacture are reliable.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have