Abstract

We have developed a pipelined data acquisition (DAQ) system for μSR experiments at the Japan-Proton Accelerator Research Complex (J-PARC). From September 2008, the J-PARC accelerator will begin the beam delivery to the muon source and the first μSR experiment will be in operation. When fully operable, the muon beam intensity at the Muon Experiment Facility will be two to three orders of magnitude greater than that of the Muon Science Laboratory (KEK-MSL). This will force us to replace the detector and the DAQ system. The new DAQ system must fit the framework for the run automation at J-PARC. We have developed a new DAQ system for this purpose, which will be used in the first experiment and will be ready for new μSR detectors for the full operation of the accelerator.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.