Abstract

A continuous evaluation of the stakeholder management process can be achieved using definitive key performance indicators (KPIs). An exhaustive literature survey in this direction provided a set of 26 indicators assessed through a questionnaire survey for their possible implications on the stakeholder management process. The survey was conducted among 55 respondents with experience in using building information modeling (BIM) in mega-construction projects. The data were initially analyzed through factor analysis to establish six KPIs. Fuzzy synthetic evaluation (FSE) was used to evaluate the index values of the established KPIs to assess their importance levels. The results presented the KPIs in decreasing order of their index values: asset performance (4.27), open innovation (4.04), project O&M expenses (3.97), design process efficiency (3.95), project execution efficiency (3.90), and stakeholder concerns (3.59). The results generated a stakeholder management process assessment framework and model that provides a clear insight into using an indicator in measuring the specific stakeholder management dimension. The findings of this work can provide definite insight amongst planning managers about the stakeholder management process through the posited indicators. Further, they can adopt measures to improve the stakeholder management process in their respective projects.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.