Abstract

A neutron beam line for multiple prompt gamma-ray analysis was constructed at the Japan Atomic Energy Agency. A detector system for the MPGA was constructed at the C2-3-2 beam line in January 2005. It comprised eight (upgraded in March 2007) clover Ge detectors with a BGO Compton suppressor. High efficiency detector system provides an advantage in terms of the detection limit of MPGA when compared to the result of PGA. The supermirror neutron bender was improved and a supermirror neutron guide was installed upstream of the sample position.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.