Abstract

Abstract At the J-PARC muon science facility (J-PARC/MUSE), a graphite target with a thickness of 20 mm has been used in vacuum to obtain an intense pulsed muon beam from the RCS 3-GeV proton beam [1] , [2] . In the current design, the target frame is constructed using copper with a stainless steel tube embedded for water cooling. The energy deposited by the proton beam at 1 MW is evaluated to be 3.3 kW on the graphite target and 600 W on the copper frame by a Monte-Carlo simulation code, PHITS [3] . Graphite materials are known to lose their crystal structure and can be shrunk under intense proton beam irradiation. Consequently, the lifetime of the muon target is essentially determined by the radiation damage in graphite, and is evaluated to be half a year [4] . Hence, we are planning to distribute the radiation damage by rotating a graphite wheel. Although the lifetime of graphite in this case will be more than 10 years, the design of the bearing must be carefully considered. Because the bearing in JPARC/MUSE is utilized in vacuum, under high radiation, and at high temperature, an inorganic and solid lubricant must be applied to the bearing. Simultaneously, the temperature of the bearing must also be decreased to extend the lifetime. In 2009, a mock-up of the Muon Rotating Target, which could heat up and rotate a graphite wheel, was fabricated. Then several tests were started to select the lubricant and to determine the structure of the Muon Rotating Target, the control system and so on. In this report, the present status of the Muon Rotating Target for J-PARC/MUSE, especially the development of a rotation system in vacuum, is described.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call