Abstract

The aim of this study is to implement Total Productive Maintenance (TPM) in a continuous injection molding industry. By implementing TPM, the industry can increase their Overall Equipment Effectiveness (OEE) and productivity. Before implementing TPM, overall equipment efficiency, availability rate, performance rate, and quality rate of the injection molding machine were 74.9%, 88.54%, 88.5%, and 95.6%, respectively. It needs to be improved for good operating condition of machines. In this paper, some tools are suggested to improve their productivity and maintenance procedure. These tools are cause and effect diagram, Pareto chart, WWBLA, and preventive maintenance schedule. TPM program is to change the culture of the company maintenance policy with involvement of all employees toward the maintenance system of the company. Through the proper planning of maintenance schedule, productivity can be improved. This schedule helps to maintain machines in good operating conditions as well as a good OEE value, and a world class standard OEE is achieved.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.