Abstract

A procedural program to monitor the effectiveness of maintenance activities was developed for CANDU reactors and, to confirm its applicability, was tested on a CANDU power plant being operated by the Korea Hydro & Nuclear Power Co. The monitoring program is based on a methodology utilizing probabilistic risk information to meet US regulation 10CFR50.65, which is known as the Maintenance Rule. There are many cases in which the Maintenance Rule is applied to Light Water Reactor systems, including PWRs and BWRs. However, it has not been applied to a CANDU Reactor System thus far. In this paper, a procedure to set up a maintenance effectiveness monitoring program is presented with an emphasis on its application to the CANDU system. Relevant solutions to problems that were encountered are introduced to make the program more suitable for the characteristics of CANDU systems. In the end, an application of the program to an operating CANDU power plant is discussed to evaluate the performance status of the plant.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.