Abstract

A full scale funnel-and-gate biobarrier has been developed for the removal of tar oil pollutants at an abandoned tar factory site near the city of Offenbach, Germany. Laboratory and on-site column studies were done to determine the operation parameters for microbiological clean-up of the groundwater polluted with 12,000 microg/L mono- aromatic hydrocarbons such as benzene and the xylenes, 4,800 microg/L polycyclic aromatic hydrocarbons such as naphthalene and acenaphthene, and 4,700 microg/L heterocyclic aromatic hydrocarbons such as benzofuran and benzothiophene. In the laboratory study, a residence time of approx. 70 h proved to be sufficient for aerobic pollutant biodegradation. Up to 180 mg/L H(2)O(2) were added and did not lead to any toxic effects to the degrading bacteria. The feasibility of the concept was confirmed in an on-site pilot study performed with a sedimentation tank (removal of ferric iron) and two bioreactors. In the bioreactors, >99.3% of the pollutants were degraded. Biodegradation activity corresponded to a significant increase in numbers of pollutant degrading bacteria. In the bioreactors, a fast dissociation of H(2)O(2) was observed resulting in losses of oxygen and temporary gas clogging. Therefore, a repeated addition of moderate concentrations of H(2)O(2) proved to be more favourable than the addition of high concentrations at a single dosing port. The full scale biobarrier consists of three separated bioreactors thus enabling extended control and access to the reactors. The operation of the funnel-and-gate biobarrier started in April 2007, and represents the first biological permeable reactive barrier with extended control (EC-PRB) in Germany.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call