Abstract

A methodology for developing congestion management–related projects for the Indiana state highway network is described. The methodology is based on a sketch planning analysis technique that can be used with limited input data. The software package provides estimates of costs and other effects of potential congestion mitigation projects to undertake in a given year, which can be used by planners and programmers in long-range planning. Project types include road widening, high-occupancy-vehicle facilities, ramp metering, incident management, and arterial traffic signal coordination. The impact is assessed in travel time savings, vehicle operating cost savings, crash cost savings, and emission reductions. An example application of the methodology is given for the 7.81-mi segment of I-65 between Interchanges 116 and 123 in the Indianapolis area.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.