Abstract

Abstract. Land subdivision represents a complex procedure which leads to the construction of a set of buildings and utilities necessary for the viability of the project: Roads, sewerage network, water network, electricity network and telecommunication networks. The techniques adopted so far to carry out land subdivision projects in Morocco have certain limitations. Several stakeholders are necessary for the realization of a land subdivision and many 2D plans and documents are used. These plans and documents are independently produced and carried out by the various trades involved in the project. If a change is made to one element of the project, which often happens, several documents and plans are affected and must be updated. This can be a source of errors and conflicts and can lead to an increase in the time and cost of the hall project. This study proposes the development of a Building Information Modelling (BIM) infrastructure workflow adapted to land subdivision projects in Morocco. The integration of BIM in this type of project is an innovation in the Moroccan context. It will improve the design, simplify communication and collaboration between the various stakeholders and facilitate the management and the monitoring of the project. The resulting digital BIM model can be used to produce 2D and 3D construction plans, take measurements and plan work. It constitutes the basic platform to perform calculations and simulations at any stage of the infrastructure life cycle and to detect and resolve interferences in a collaborative environment.

Highlights

  • Streets and facilities of land subdivision projects in Morocco are treated with representations through 2D plans and rarely in 3D

  • This study proposes to develop a Building Information Modelling (BIM) infrastructure workflow adapted to facilities of land subdivision projects in Morocco

  • The workflow proposed made it possible to demonstrate the advantages of BIM infrastructure applied to land subdivision projects

Read more

Summary

Introduction

Streets and facilities of land subdivision projects in Morocco are treated with representations through 2D plans and rarely in 3D These projects regularly present technical issues that are difficult to understand using only 2D plans. BIM is a working method using an intelligent 3D digital model as a reliable basis from design to operation phases It facilitates information exchanges and collaboration between the different stakeholders in a construction project by defining the responsibilities, periods and limits of intervention of each. The digital BIM model is made up of objects defined by a multitude of geometric, technical, financial, functional, time, cost and energy characteristics. It is produced by the designer using BIM solutions appropriate to the nature of the project. It is enriched and used by the various collaborators of the project

Methods
Discussion
Conclusion

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.