Abstract

We have developed a new intermittently aerated anaerobic-aerobic activated sludge process. This process employs 2 reactors connected in series, and is capable of controlling the duration of aerobic, anoxic and anaerobic conditions in both reactors by utilizing the ORP bending point, which corresponds to the termination of denitrification. One cycle of aeration and agitation takes approximately 120 minutes. In the 1st reactor, nitrification and phosphorus uptake occur in the aeration period, followed by denitrification and phosphorus release in the agitation period. In the 2nd reactor, nitrification and phosphorus uptake are conducted during aeration, and denitrification and weak phosphorus uptake during agitation. A one-year pilot plant experiment using sewage (22 m3/day) showed stable and high removal ratios of 98% for BOD, 92% for T-N, and 85% for T-P under conditions of HRT 20 hours and water temperature 9∼33°C.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.