Abstract
The formation, development and fracture of the separation space of the coal seam roof are accompanied by the formation of water hazard of the separation layer of the working face. Using UDEC numerical simulation method, taking a certain working face of a mine as the research object, the dynamic development process of the separation space of overburden of the coal seam roof during the mining process of the working face is analyzed, and the separation development position and three-zone height are determined, which provides theoretical basis for the formation mechanism of water hazard of the separation layer of the mine.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.