Abstract

The use of electromagnetic relays in railway control systems is very problematic. The solution to this problem is based on process modelling and the use of microelectronic devices. The functional scheme for different modes of operation of twin switches control unit has been developed and investigated. Algorithms and functional scheme of microelectronic unit are given.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call