Abstract

Acoustics and noise management play an integral role in providing an optimum care environment for patients and staff of healthcare facilities. Indoor noise and vibration affect patient comfort and healing, clear communication, operation of sensitive imaging equipment, and overall occupant satisfaction. Construction and demolition activities often occur in occupied hospitals requiring ongoing noise and vibration sensitive operations to remain active. This case study presents the development and implementation of a construction noise and vibration management plan for a neonatal intensive care unit (NICU) expansion project. The expansion included the addition of 23 NICU beds an existing roof level, directly adjacent to an existing NICU unit, Post-Anesthesia Care Unit, operating rooms, and In Vitro Fertilization clinic which remained in operation during demolition and construction. The acoustical design process from establishment of baseline conditions, prediction of project-related noise and vibration, design of mitigation strategies, and development of the management plan will be presented. Monitoring data collected over the 15 month demolition and construction period will be reviewed along with project implementations strategies and lessons learned.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.