Abstract
Development and First Year Operation of Extended Wastewater Treatment Plant in Dobron The aim of the investigation was characterizing and operation assessment of the wastewater treatment plant in Dobron taking into consideration its flow capacity, before (350 m3/d) and after development including building of the second technological pipe with the same flow capacity (350 m3/d), finished in September, 2009. Concise description of the applied wastewater treatment technology and results of investigations concerning flow rates of wastewater within last few years, are presented. Example results of wastewater composition analysis and reached treatment conversion are described. Analysis results of screenings, sand removed from sand traps and stabilized sludge are shown.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.