Abstract

In BTA deep hole drilling straightness deviation of the bore is a very important quality criteria. The avoidance of straightness deviation is not possible due to the many influencing variables. Currently used methods for compensation require significant additional time, as they either require the interruption of the drilling process, or require an additional boring process. By using a newly developed, manufactured and tested compensation unit, which is mounted between the drill head and the drill pipe, a targeted tilting of the drill head and thus a targeted influencing of the straightness deviation in the running process is possible with the use of a radially adjustable control pad and an innovative actuator concept. The developed measuring system offers the possibility to record the straightness deviation during the drilling process. On the basis of experimental test series, a control system was developed and applied to the BTA deep drilling process. After a drilling path of 1,000 mm, a maximum straightness deviation reduction of approx. 51% can be realized. Compared to the process without control and compensation unit, the progressive increase of the straightness deviation was significantly reduced.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.