Abstract
There are three main criteria that account for a construction project’s success: completion on-time, within budget, and following the specifications. Nowadays, construction projects are facing various problems where delays are considered major one of them, particularly in Egypt. Analyzing construction delay causes while attempting to mitigate their impact is a matter of crucial importance. That’s why a program was developed to help the user assess the delay causes’ impact with respect to the project’s concerned activities. Besides, it was designed to identify the potential mitigation measures according to the delay cause type. The Building Information Modeling (BIM) was the platform used to carry out such analysis. Thus, the main objective of this study is to investigate the delay causes’ effect on the project’s duration and cost. This was achieved by analyzing the concerned activities’ affected duration and cost, according to the selected delay cause and its associated mitigation measures, by means of a developed user plug-in. Then, duration/cost summary tables were presented for the user to highlight the main findings in terms of delay and saving impact. The attained results were considered important indicators to be referred to for similar cases throughout the project progress. Apart from being a helpful tool for assessing construction delay causes’ impact, this developed user plug-in could also serve in future research works associated to this subject.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.