Abstract

ASME Section III, Division 3, “Containments for Transportation and Storage of Spent Nuclear Fuel and High Level Radioactive Material and Waste” currently addresses the design of transportation and storage containment shells but it has yet to address the containment internal support structure that holds the spent fuel or high level waste in place. However, the code for internal support structures, hereafter referred to by its common name “basket”, has been under development by ASME for the past 2 years. Development of the new code, to be known as Subsection WD, “Internal Support Structures” was deemed necessary because current containment system basket construction is a piecemeal approach using ASME Section III, Division 1, Subsection NF, “Supports” and/or ASME Section III, Division 1, Subsection NG, “Core Support Structures” or some other engineering method. Approvals for the various combinations are granted from the regulatory authority. The piecemeal approach tries to capture the critical elements important for a containment basket. However, Subsections NF and NG are based on nuclear power plant design which has different design goals than for a spent fuel or high level waste containment. The issuance of Subsection WD will ensure standardization of future containment baskets, assist the regulatory agency in the review and approval of the baskets, and ensure that the essential criteria in the basket related to spent fuel and high level waste storage transportation and disposal is adequately addressed. The purpose of the basket is primarily to ensure that the radioactive components in the containment are supported in a way as not to create a criticality event. Current acceptance is typically based on a no yield design that the containment manufactures all say is too conservative and based on unreasonable criteria. What should the basket design be based on, how should Subsection WD address them, etc.? The purpose of this paper is to inform interested parties of the progress that has been made in development of Subsection WD, what construction provisions it will initially include and what is planned for it, and when is it scheduled to be issued.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.