Abstract

Quick response to market change has become a critical strategy for businesses in the global competitive environment. Since product design usually occupies a major time period of the product development process, shortening the time spent in the re-design stage has become an important issue for businesses. In this research, an environment integrating a PDM and an MRP application was proposed. By applying the concepts of Activity Based Costing (ABC), this environment can be used to support designers in a part re-design project to analyze inventory scrap costs. Using ARIS software, an eEPC model describing the re-design process in PDM, as well as the scrap cost analysis process, was developed. The major function of this integrated environment is to support the designer in making quick and proper decisions to reduce the inventory scrap cost of existing parts during the product re-design project.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.