Abstract

In all aspects of the project scheduling, either Net present value or minimizing the Finish Time which is related to projects have roles to play; which is why in this survey we try to consider both of these important criterionin order to propose a mathematical model. The purpose of this study was to develop a scheduling model for minimizing project duration and maximizing present value of project. For this purpose, both positive and negative cash flows were considered in the model and two goal functions were considered. Finally, this model was used for a real project and its results were analyzed. For this purpose, PRIMAVERA software was used.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.