Abstract
The Shanghai Transport Committee has estimated that passenger traffic increased fivefold between 2005 and 2014, and will continue to increase. At the same time, the maintenance costs of the Shanghai Metro have increased to about six times their original value. To ensure reliability, availability, maintainability and safety (RAMS) in railways, equipment sometimes needs to be upgraded; new technology is an effective way of modernizing the system. Condition monitoring techniques are considered to be a pragmatic approach to improve RAMS in railways. Bearings are seen to be a key factor in the successful operation of railways, as their performance is related to safety and reliability. To meet the safety requirements, an efficient method is to implement a real-time condition monitoring (RTCM) technique. To evaluate the economic cost of this investment in RTCM, the life cycle cost (LCC) should be considered. A Petri net combined with the Monte Carlo method is used to simulate the LCC evaluation process and a case study of how to employ this method is presented.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Proceedings of the Institution of Mechanical Engineers, Part F: Journal of Rail and Rapid Transit
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.