Abstract

We developed and evaluated a framework for the continuous use of dynamic models in daily management and operation of WWTPs. The overall aim is to generate knowledge and build in-house capacity for the reliable use of dynamic models in practice (within a regional water authority in The Netherlands). To this end, we have adopted a life cycle approach, where the plant model follows the different stages that make up the typical lifespan of a plant. Since this approach creates a framework in which models are continuously reused, it is more efficient in terms of resources and investment than the traditional approach where one always makes a new model for the plant whenever it is needed. The methodology was evaluated successfully at a 50,000 PE domestic EBPR plant (Haaren, The Netherlands). It is shown that the continuous use and update of models in a cyclic manner creates a learning cycle, which results in experience and knowledge generation about the plant's modelling that accumulates and translates into improvements into the modelling quality and efficiency. Moreover, a model is now always on-the-shelf for process optimization.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.