Abstract

According to phase-contrast microscope analysis based on the JIS A 1481: 2006, chrysotile in the asbestos-containing building material waste was not detected after heating at 800°C for over 2 h. The asbestos-cement which was ground to below 180 μm after heating asbestos-containing building material waste at 800°C for 3 h was added into OPC to fabricate secondary cement product. When 50 mass% of the asbestos-cement was added to OPC, the compressive strength of the secondary cement product after 7 days was 32 MPa. Further chrysotile was not detected in the secondary cement product using phase contrast microscope analysis.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.