Abstract
According to phase-contrast microscope analysis based on the JIS A 1481: 2006, chrysotile in the asbestos-containing building material waste was not detected after heating at 800°C for over 2 h. The asbestos-cement which was ground to below 180 μm after heating asbestos-containing building material waste at 800°C for 3 h was added into OPC to fabricate secondary cement product. When 50 mass% of the asbestos-cement was added to OPC, the compressive strength of the secondary cement product after 7 days was 32 MPa. Further chrysotile was not detected in the secondary cement product using phase contrast microscope analysis.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.