Abstract
The results of separation tests performed in Unit 1 at the Rostov nuclear power station at 100% of reactor thermal power are presented and were carried out for the first time without admission of indicating salt into the steam generator volume. The results of these tests are compared with the data of separation tests carried out at the stage of commissioning works.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have