Abstract
The main purpose of this paper was to adopt the fuzzy synthetic evaluation method, which uses the analytic hierarchy process (AHP) for determining a weight vector, to assess the repair ranking of existing reinforced concrete (RC) bridges. Five existing RC bridges in Taiwan were used as illustrative examples. To verify the feasibility and reliability of the proposed method, the previous wide reliability bound method was also employed to assess the same five existing RC bridges. The results obtained from both the proposed and wide reliability bound methods produced the same repair rankings. The results represented in this study can be used as an engineering decision‐making tool for the repair, strengthening or demolition rankings for existing RC bridges.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.