Abstract

The question considered in this paper is how large does an in‐control reference sample need to be in order to control the effects of using estimated parameters when using a normal‐theory cumulative sum (CUSUM) tracking statistic? Previous research has demonstrated the effect of estimation errors on the conditional in‐control average run length of the CUSUM. The contributions of this paper are simple analytical tools that determine the required reference sample size needed to ensure probabilistic control of the relative error of the conditional in‐control average run length. The availability of these tools rounds out the design phase of the CUSUM by enabling a practical procedure for determining the needed size of the reference sample. Copyright © 2016 John Wiley & Sons, Ltd.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.