Abstract

AbstractDrought analysis is a vital component of water resources planning and management for dam and hydroelectric power plant (HPP) construction, reservoir operation and flood control. In this study, stochastic models were developed to estimate the monthly and annual flows of the Karasu River in the upper section of the Euphrates River valley. A time series model of flows was established based on the Box–Jenkins methodology. An autoregressive (AR) model was selected as the most suitable model. One hundred synthetic series, having the same length as the historical series (40 years), were produced using the AR model. It was also possible to control whether or not the generated time series maintained the statistical characteristics (mean and standard deviation) of the historical time series. After applying specified threshold levels (q = 0.5; q = 0.3; q = 0.1), the historic and synthetic flow series were subjected to runs analysis. Dry period lengths (run sum and run length) of historic and synthetic flow series were determined. Future droughts are estimated using maximum dry period lengths.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.