Abstract

A crucial decision in defining the scope of an environmental impact assessment is to delineate the initial assessment area. We developed a probabilistic methodology to determine this area, which starts by identifying a key environmental variable, maximum acceptable change and acceptable probability of exceeding that threshold.The exceedance probability is determined with a limits of acceptability rejection sampling of informed prior parameter distributions. A qualitative uncertainty analysis, a formal and systematic discussion of the main assumptions and model choices, is complemented with global sensitivity analysis of the model results to identify the major sources of uncertainty and provide guidance for further research and data collection.For the case study on coal development in the Gloucester Basin (NSW, Australia), the initial assessment extent is unlikely to extend more than 5 km from the edge of the planned coal mines. The major source of uncertainty is the planned mine water production rate.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.