Abstract
Past studies indicated binder from reclaimed asphalt pavement (RAP) aggregates only partial degree of blending (DOB) within hot mix asphalt (HMA). Most state agencies assume full blending, which may lead to under asphalting. This study focuses on determining the impact of it on predicted performance using ME level I analysis of six 25% RAP mixes. Dynamic complex modulus (DCM) tests were conducted with full and “actual” blending, all greater than 85%, using varying conditions comparing rutting and fatigue performance. The results indicate high DOB RAP mixes with uniform gradations have negligible effect on predicted performance and would not compromise performance.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.