Abstract

AbstractThe request for proposal (RFP) with the design-build (DB) procurement arrangement is a document in which an owner develops his requirements and conveys the project scope to DB contractors. Owners should provide an appropriate level of design in DB RFPs to adequately describe their requirements without compromising the prospects for innovation. This paper examines and compares the different levels of owner-provided design in DB RFPs by the content analysis of 84 requests for RFPs for public DB projects advertised between 2000 and 2010 with an aggregate contract value of over $5.4 billion. A statistical analysis was also conducted to explore the relationship between the proportion of owner-provided design and other project information, including project type, advertisement time, project size, contractor selection method, procurement process, and contract type. The results show that the majority (64.8%) of the RFPs provides less than 10% of the owner-provided design. The owner-provided design proport...

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call