Abstract

AbstractIn electricity markets, transfer capability is a parameter showing the potential of a considered source–sink pair to transfer power. This paper enhances transfer capability monitoring by proposing a method to determine this parameter with respect to a region referred to as the ‘transfer capability region’ (TCR). The boundary of a TCR is traced by using the modified predictor–corrector process on a plane of real and reactive powers. The TCR shows a set of feasible loading points at the sink area. Moreover, the shape of TCR always changes according to the system parameters. This paper also defines the outermost boundary of the TCR when the considered parameters are set to be free. We apply the proposed method to test systems, and then compare to the maximum loading points obtained by the conventional transfer capability calculation. © 2012 Institute of Electrical Engineers of Japan. Published by John Wiley & Sons, Inc.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.