Abstract

A simulation-based study is presented to compare the performance of a set of kanban allocation rules in a flexible manufacturing system (FMS) operating in a pull mode. This paper also presents a simulation-based direct search approach to determine the optimal number of kanbans and their simultaneous allocation to different part types. This paper presents a realistic cost function that includes a penalty for failing to meet the demand on time, and a penalty for rescheduling delivery of materials from vendors. The model captures limited flexibility in the form of operational flexibility in a FMS. Future extensions to this study are discussed.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.