Abstract

The problem of finding the integral content of the components of substances and materials for a given volume and mass of a substance (material) at certain moments or time intervals based on weighted average estimates is considered. The solution of the problem is important for control, recording, and monitoring of production of substances in industrial-scale volumes, generation of waste, including emissions and discharges. Formulas are given for calculating the total standard uncertainty of weighted average estimates, taking into account the uncertainty of the values of the weighting coefficients of the estimates, due to the uncertainty of the mass measurements of the analyte.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.