Abstract
To ensure availability of the adequate and reliable supply of electricity, Ghana is taking necessary steps towards the implementation of a nuclear power program in the country. Among the steps being taken is the determination of suitable sites for the operation of nuclear power plant. This paper outlines major factors which influence the site selection, i.e. geology, hydrology, seismicity, etc. proposed by the IAEA and some countries and relates them to the situation in Ghana. In this regard, the major issues that have come up in the site selection in Ghana are discussed. These include preference of coastal areas to the inland fresh water areas due to concerns about the site location in fresh water bodies and elimination of the areas with fault lines and relatively high level seismicity. Putting all factors together, site location has been limited to the areas along the coast at the west of the Akwapim fault. This area, which lies between 0 o 23’ west and 3 o 06’ west, is being assessed to obtain a candidate site. On-going activities to identify candidate sites are presented and measures to deal with challenges associated with site selection are also discussed. DOI: http://dx.doi.org/10.5755/j01.erem.62.4.2655
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Environmental Research, Engineering and Management
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.