Abstract

Time is one of the factors to assess a worker's performance in utilizing the available resources. Operator in his work requires efficient time to improve work productivity. One of factory in produce a shrimp feed in Surabaya has a large production level. In the production process, the packaging department in this company still uses human resources in their production process and the company define the standard of production without using standard time. This paper investigates the opportunity a logical analysis in determining the standard time in this company. The determination of the standard time in the packaging process requires comprehensive analysis. Objects observed are four operators in the packaging department that carried out the activities of filling bag the shrimp feed with 40 replication for each data. The work measurement was conducted by direct method using Stopwatch Time Study (STS) with snap-back method. The results of this study indicate the standard time value of the four lines packaging is not much different or almost the same. Sequentially the standard time workers line 1 to line 4 is 7.325 seconds, 7.240 seconds, 7.225 seconds, and 7.065 seconds. Allowance used for workers is 8%. However, the existing production rate of company is higher than the production rate of work measurement calculation. This is due to the difference of definition in employee allowance rate and performance rating.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.