Abstract
The optimisation of power-system operating conditions is formulated as a general mathematical programming problem. All the system voltages, active and reactive generations and transformer tap settings are considered as independent variables, with network equations represented by equality constraints, and system operating limits by inequality constraints. An iterative indirect approach to the problem based on the Lagrange-Kuhn-Tucker conditions of optimality is presented, and the computer program is described briefly. A small sample system of part of the British 275/132kV network is solved.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Proceedings of the Institution of Electrical Engineers
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.