Abstract

Abstract The question is: whether the system total travel cost and travel time are reduced by adjusting the work start time or not? This paper proposes the two‐level model for answering the question; the upper‐level minimizes the system travel cost and travel time by using the work start time as a decision variable, the lower‐level models the stochastic dynamic simultaneous route/departure time equilibrium problem. Finally, numerical results of a small network are provided to illustrate the behavior of the model.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.