Abstract
This study aims at giving descriptive computation of determining the optimal location and capacity of Distributed Generation (DG) for the compensation of active and reactive power on the electric power system using Artificial Bee Colony and minimizing the power losses. It employed the IEEE 34-Bus Reliability Test System (RTS) as the case study focusing on the determination of the location and capacity of Distributed Generation using Artificial Bee Colony algorithm. The data analysis shows that the placement of DG on the IEEE 34-bus system employing ABC can reduce the real power losses and the real power losses at the optimal location and capacity is minimum.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.