Abstract

The Gemas – Johor Bahru Electrified Double Track Project (GJBEDTP) is the most recent railway electrification. GJBEDTP runs from Gemas Railway Station to Johore Bahru (JB) Sentral. Since the JB Sentral station platform track is existing, it cannot achieve the minimal offset in the client's Statement of Needs (SON). The station canopy's acting load capacity is limited, so it cannot support the Overhead Line Equipment (OLE). Malaysia's standard offset value was 3.0 m, while the KTMB guideline's maximum offset value is 3.60 m and the minimum is 2.60 m. Thus, this research investigates the concrete mast offset that should be used when track separation is lower than standard. JB Sentral architecture data was collected to evaluate the mast offset. Sicat Master simulation and a cross-sectional diagram can be used to determine the proper minimum offset from the data collected. The results show that the mast at the centre of the two tracks can achieve clearances with the minimum offset of 1.80 m from the track centreline to the concrete mast face. These results also show that tangent track alignment allows a minimum offset of 1.80 m at a lower train speed.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.