Abstract

Abstract This study was designed to determine Maximum Horizontal Distance (XMHD) travelled by landfill leachate. Twenty - nine Schlumberger Vertical Electrical Soundings (VES) were conducted at 10.0m intervals away from four sides A, B, C and D of Lapite dumpsite. One VES point conducted outside the vicinity of the dumpsite served as a control. VES data were processed. Lowest resistivity values (Y) of VES points and the control point (Yc) were extracted. Curves of Y against X fitted best to yield an equation. XMHD was determined from the generated equation when Y = Yc. The determined (XMHD) on the four sides ranged from78.95m to 179.86m.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.