Abstract

This paper describes a method of determining the maximum probable rates at which power system frequency will decay following a disturbance which results in an overload on the available generation. The analysis is based on the maximum electrical load which a generator-transformer combination will accept as a function of the characteristics of the unit and the system to which it is connected and the initial operating conditions. The analysis and results presented are of value in providing underfrequency protection for nuclear plants and in the application of frequency relays for load shedding purposes.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.