Abstract
In manufacturing systems, there often exists a bottleneck machine whose capacity is equal to or less than the market demand. Any idle or waste time at the bottleneck machine directly impacts the output of the entire plant because it results in a loss of throughput. In order to maximize the capacity utilization by less setup losses at the bottleneck machine, the parts are often produced in batches. Traditionally, most batch sizing decisions are made based on the economic order quantity model where setup and inventory holding costs are considered. This paper presents an alternative method to determine batch size at a bottleneck machine. We present a new objective function and cost factors for batch sizing and investigate queuing and throughput models. A linear search algorithm is introduced to find the optimal throughput rate and batch size at the same time. Numerical examples are examined to see how the batching algorithm works.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.