Abstract
Rework represents the unnecessary effort of redoing a process or activity that is incorrectly implemented the first time. Using a structured questionnaire survey, the causes and costs of rework in 161 Australian construction projects were identified. Respondents were invited to indicate direct and indirect rework costs that would be subsequently combined to produce a total rework cost (TRC) figure. Stepwise linear multiple regression analysis was then used to determine a model that included an optimum mixture of significant variables that contributed or lead to a reduction in TRC for the projects sampled. The research revealed that reworkper secan negatively influence project safety. Client initiated changes and ineffective use of information technology by the design professionals were identified as being significant variables contributing to rework occurrence. Contrary to an earlier presupposition, design scope freezing was also identified as being a significant factor that can contribute to rework.
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Engineering, Construction and Architectural Management
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.