Abstract

Highway 191 near Bluff, Utah, features a well-monitored section of the long-term pavement performance (LTPP) program. Constructed in 1980, this section of flexible pavement performed well for nearly 13 years. Through this time, cracking of the asphalt layer was minimal. In the fourteenth year, however, the extent of longitudinal cracking in the wheel path increased and necessitated placement of a chip seal on the pavement surface. The purpose of this research was to determine the cause of pavement deterioration using LTPP data. Deflection basins obtained from falling-weight deflectometer testing were analyzed to investigate the extent to which structural degradation influenced deterioration of the pavement. Pavement layer modulus values were plotted against time and clearly show that weakening of the pavement base layer immediately preceded the occurrence of cracking. The geography of the site, as documented in photographs, supports the conclusion that inadequate water drainage at the site permitted saturation of the aggregate base layer during a period of midsummer flooding. This finding emphasizes the importance of specifying non-moisture-susceptible base materials and providing necessary drainage works in pavement design.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.