Abstract
The paper deals with the protective relaying of MV rings recently introduced by e-distribuzione, the largest Italian Distribution System Operator (DSO). The paper refers to an existing MV distribution system which includes a loop line. Attention is focused on Cross-Country Faults (CCFs), i.e. two Line-to-Ground Faults simultaneously occurring in two different phases at different locations. A large number of detailed ATP-EMTP simulations of CCFs are carried out, evidencing a few critical CCF combinations not detected by the presently adopted protective relays. Results point out that such maloperations only occur in mixed overhead-cable rings, while all-cable loop lines are not affected. Lastly, it is also shown that CCF detection is not a problem in mixed overhead-cable rings if the overhead lines are equipped with a ground conductor. The above results could be taken as guidelines for new ring lines.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.