Abstract

ABSTRACT For rapid production of spatial data and topographic maps, map production systems should be transformed into a dynamic structure. Topographic map production system in Turkey, cartographic operations for each map are repeated in the same way, regardless of the amount of data updated in the geographic database. The implementation of similar actions on maps with very few changes is not time and cost effective. In this study, changes were determined by comparing the current and previous data from TOPODB and the resulting changes were integrated into the population class of 1:25.000 scale topographic maps in a third less time.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.