Abstract

This paper reports on the modeling issues performed related to a feasibility study to investigate the possibilities to connect the 640 MW off-shore wind power farm, planned for Krieger's Flak 30 km south of Trelleborg (Sweden), to the E.ON 130 kV subtransmission system. The aim of the entire study is to answer the question if such a connection is possible, and under what conditions; it is not meant as a design project. Following a general connection design discussion, the study comprises three major parts, fault current calculations, load flow calculations, and dynamic simulations. Concerning the modeling aspects, much effort has been put on details and scalability for the dynamic simulations.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.