Abstract

The procedure of factory acceptance test for ITER vacuum vessel lower port stub extension has been set to that visual test, pressure test, baking, vacuum leak test, and final dimensional inspection as listed order. Among them, the pressure test and the baking are challengeable to meet the required conditions because of the nuclear pressure equipment. The full pressure test condition has been set to 3.78 MPa, and the baking condition has been set to 200 °C during 24 h as well. The structural and thermal analysis have been conducted to verify the structural safety and predict thermal effect under the actual conditions, respectively. As a result, the optimal test configurations have been established. During the pressure test, dimensional verifying points are set based on the structural analysis results. Moreover, the convective baking method has been regarded as the optimal way because of complex double wall structure and difficulty of heating rate control. In this paper, whole procedure of the factory acceptance test for the lower port stub extension is introduced, and detail method of pressure test and baking have been reported.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.